Projects
![]() |
Lock Hengelo
Client: Ministry of Waterways and Public Works Zoetermeer.
|
|
Lock Terneuzen Client: Ministry of Waterways and Public Works, Management Zeeland. Description: ship safety catch in lock of the Canal from Gent to Terneuzen. |
![]() |
Eems power station
Client: Epon N.V., Zwolle. |
![]() |
Kerkslootbridge
Client: Local Authorities Wymbritseradeel of IJlst. |
![]() |
Bridge Zwanenburg
Client: Local Authorities of Haarlemmermeer. |
![]() |
Frisiabridge Client: Provincial Authorities of Friesland. Description: Frisiabridge of Franeker.
|
![]() |
Bridge Hollandse Hout
Client: Local Authorities of Lelystad.
|
![]() |
Bridges Reitdiep
Client: Local Authorities of Groningen.
|
![]() |
Lock of Grevelingen
Client: Ministry of Waterways and Public Works, Management Zeeland.
|
![]() |
Pumping Station De Bosschen Client: Water Authority De Groote Waard.
|
![]() |
Balder Project: DCV Balder, hydraulic and electrical installation for watertight doors.
|
![]() |
Lock of IJmuiden
Client: Ministry of Waterways and Public Works.
|
![]() |
Pumping Station IJmuiden
Client: Ministry of Waterways and Public Works.
|
![]() |
Zandkreekdam
Client: Ministry of Waterways and Public Works.
|
![]() |
Bosrand Bridge
Client: Provincial Authorities of Noord-Holland.
|
![]() |
Test unit
Client: Venema/v.d. Zee.
|
![]() |
Supply unit
Client: Bergschenhoek.
|
![]() |
Yacht
Client: Amels Shipyard.
|
|
|
Minister opens technical highlight On Saterday juni 25th, 2005, at-that-time Minister Karla Peijs of Transport and Communications and Toine Poppelaars, Provincial Executive of the Province of Zeeland, opened the second bridge over the Grevelingen lock of Bruinisse, that was named "De Ysere Ryve" (the iron rake) on the occasion. (Photograph: Marijke Folkertsma)
|
![]() |
Powerpacks for drilling platform 4 pieces of 12 kW hydraulic powerpacks with ABS-quality mark for the control of stopper plates on a drilling platform (Santa Fe Drilling Rig 185). These linear winches keep the platform in its place.
|
![]() |
Lock "Hartelsluis" of Rotterdam Extensive renovation works on the lock "Hartelsluis" of Rotterdam. The works included renovation of the cylinders opening and closing the lock's doors and total overhaul of the hydraulic installation.
The Hartelsluis is an important part of the water barrier structures belonging to the Maeslandt barrier. The cylinders weigh 12 tonnes each which made transport by truck impossible. Therefore the cylinders were removed and brought back again by ship (photograph). |
![]() |
Parksluizencomplex of Rotterdam Extensive renovation of the so-called Parksluizen Complex of Rotterdam for the Rotterdam Harbour Authority.
The renovation comprised:
- replacement of 3 bridges with their drive units;
The activities of A.P. van den Berg included supply and installation of 3 new power packs and 6 hydraulic cylinders with auxiliary lines for the 3 bridges of the complex, and replacing the drive engines as well as the 2 power packs of the locks. With the new hydraulic system a number of improvements were introduced, with respect to the hydraulic system itself as well as the control system. For instance a safety system for holding the bridge in position when it is not controlled due to a failure, pressure limitation to prevent a too high load on the bridge construction, and automatic shut-off of the engines in case of a calamity.
The new control system enables a proportional operation of the hydraulic installations, making bridge and lock movements very smooth. With the activities concluded in the first half of 2006, the intricate infrastructural system is fully available to traffic once again.
|
![]() |
Lifting bridge in Rotterdam Replacement of the Prinses Irenebrug over the river Rotte of Rotterdam.
|